Triple
T28393664
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | UK Round 2 offshore wind projects |
E719222
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | offshore wind farm development round |
C25986
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: offshore wind farm development round Context triple: [UK Round 2 offshore wind projects, instanceOf, offshore wind farm development round]
-
A.
offshore wind licensing round
chosen
An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
-
B.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
C.
offshore oil and gas development project
An offshore oil and gas development project is a large-scale, capital-intensive initiative that plans, designs, constructs, and operates facilities at sea to extract, process, and transport hydrocarbons from subsea reservoirs to market.
-
D.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
E.
hydrocarbon exploration licensing round
A hydrocarbon exploration licensing round is a formal, time-bound process in which a government offers defined areas or blocks for companies to bid on rights to explore for and potentially produce oil and gas resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6efd1b08190ae3cefd4f11388a2 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:15 a.m.