Triple

T28393553
Position Surface form Disambiguated ID Type / Status
Subject Gunfleet Sands Demonstration Project E719219 entity
Predicate instanceOf P0 FINISHED
Object offshore wind power project C7975 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: offshore wind power project
Context triple: [Gunfleet Sands Demonstration Project, instanceOf, offshore wind power project]
  • A. wind power facility chosen
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • B. offshore wind licensing round
    An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
  • C. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • D. offshore oil and gas development project
    An offshore oil and gas development project is a large-scale, capital-intensive initiative that plans, designs, constructs, and operates facilities at sea to extract, process, and transport hydrocarbons from subsea reservoirs to market.
  • E. wind power industry
    The wind power industry encompasses the development, manufacturing, installation, operation, and maintenance of wind energy technologies and infrastructure to generate electricity from wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6efd1b08190ae3cefd4f11388a2 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:15 a.m.