Triple

T28392809
Position Surface form Disambiguated ID Type / Status
Subject King’s Navy Yard E719200 entity
Predicate instanceOf P0 FINISHED
Object British naval dockyard C21665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British naval dockyard
Context triple: [King’s Navy Yard, instanceOf, British naval dockyard]
  • A. Royal Navy shipbuilding establishment
    A Royal Navy shipbuilding establishment is a naval facility dedicated to the design, construction, fitting out, and sometimes repair of warships and auxiliary vessels for service in the Royal Navy.
  • B. Royal Navy station
    A Royal Navy station is a geographically defined area or shore establishment from which Royal Navy forces are administered, supported, and directed for operations within a particular region.
  • C. royal dockyard chosen
    A royal dockyard is a state-owned naval shipbuilding and repair facility historically operated by a monarchy to construct, maintain, and supply its warships and maritime infrastructure.
  • D. Royal Navy training ship
    A Royal Navy training ship is a vessel designated for the instruction and practical seamanship training of naval recruits, officer cadets, and specialist personnel.
  • E. Royal Navy organization
    A Royal Navy organization is a structured entity within the United Kingdom’s naval service responsible for planning, directing, and supporting maritime operations, personnel, and resources to achieve national defense and security objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ef211081909d31d9be5f5567e6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:14 a.m.