Triple

T28381682
Position Surface form Disambiguated ID Type / Status
Subject Transrapid E718905 entity
Predicate instanceOf P0 FINISHED
Object high-speed rail technology C3405 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed rail technology
Context triple: [Transrapid, instanceOf, high-speed rail technology]
  • A. high-speed railway
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • B. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • C. proposed high-speed ground transportation system chosen
    A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
  • D. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • E. rail transportation infrastructure
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:07 a.m.