Triple

T28381681
Position Surface form Disambiguated ID Type / Status
Subject Transrapid E718905 entity
Predicate instanceOf P0 FINISHED
Object maglev train system C23700 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maglev train system
Context triple: [Transrapid, instanceOf, maglev train system]
  • A. maglev railway line chosen
    A maglev railway line is a transportation route equipped with magnetic levitation and guidance systems that enable high-speed, low-friction train travel along a dedicated track.
  • B. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • C. air-cushion vehicle
    An air-cushion vehicle is a craft that travels over land or water supported by a cushion of air formed by downward-directed fans and contained by flexible skirts.
  • D. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • E. straddle-beam monorail
    A straddle-beam monorail is a transit system in which rubber-tired vehicles ride astride a single elevated concrete or steel beam, using it for both support and guidance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:07 a.m.