Triple
T28381238
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Église Saint-Séverin in Paris (later phases) |
E718895
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | architectural work phase |
C39075
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: architectural work phase Context triple: [Église Saint-Séverin in Paris (later phases), instanceOf, architectural work phase]
-
A.
architectural work
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
B.
building alteration phase
chosen
The building alteration phase is the period in a building’s lifecycle during which modifications, renovations, or upgrades are planned and executed to change its structure, systems, or use without fully demolishing it.
-
C.
architectural project involvement
Architectural project involvement is the coordinated participation of stakeholders, professionals, and resources throughout the planning, design, and execution phases of an architectural endeavor.
-
D.
architecture work
An architecture work is a tangible or digital artifact that represents the design, planning, or documentation of a built environment, such as drawings, models, specifications, or design narratives.
-
E.
architectural work series
An architectural work series is a curated collection of related architectural projects or designs that share a common theme, style, purpose, or conceptual framework and are presented together as a cohesive body of work.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:06 a.m.