Triple
T28380345
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CEQR Technical Manual |
E718873
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | environmental review guidance |
C21772
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: environmental review guidance Context triple: [CEQR Technical Manual, instanceOf, environmental review guidance]
-
A.
environmental assessment document
An environmental assessment document is a formal report that evaluates the potential environmental impacts of a proposed project or action, considering alternatives and mitigation measures to inform decision-making and regulatory compliance.
-
B.
environmental regulation compilation
chosen
A curated collection of laws, policies, standards, and guidelines that govern human impacts on the environment, organized for reference, analysis, and compliance support.
-
C.
environmental impact assessment law
Environmental impact assessment law is the body of legal rules and procedures that requires proposed projects or policies to be evaluated for their potential environmental effects before approval or implementation.
-
D.
land use review process
The land use review process is a formal, often multi-step procedure through which proposed developments or changes in land use are evaluated for compliance with zoning regulations, environmental standards, and community planning goals before approval or denial.
-
E.
environmental observance
Environmental observance is the practice of attentively monitoring, recognizing, and responding to natural and human-driven changes in ecosystems to support their protection and sustainable management.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:06 a.m.