Triple

T28379850
Position Surface form Disambiguated ID Type / Status
Subject Cleve Hill substation E718860 entity
Predicate instanceOf P0 FINISHED
Object electrical substation C53974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electrical substation
Context triple: [Cleve Hill substation, instanceOf, electrical substation]
  • A. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • C. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • D. electrical enclosure
    An electrical enclosure is a protective housing designed to contain electrical components and wiring, shielding them from environmental hazards and preventing accidental contact.
  • E. substation automation standard
    A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:05 a.m.