Triple
T28379802
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Siemens SWT-3.6-120 |
E718859
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | offshore wind turbine model |
C26093
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: offshore wind turbine model Context triple: [Siemens SWT-3.6-120, instanceOf, offshore wind turbine model]
-
A.
wind turbine model
chosen
A wind turbine model is a conceptual or physical representation that simulates the structure, behavior, and performance of a wind turbine under various environmental and operational conditions.
-
B.
offshore wind licensing round
An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
-
C.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
D.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
E.
airborne wind energy system
An airborne wind energy system is a power-generation technology that uses tethered flying devices (such as kites or drones) to capture wind energy at higher altitudes and transmit it to the ground.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:05 a.m.