Triple

T28379476
Position Surface form Disambiguated ID Type / Status
Subject Grain Power Station E718851 entity
Predicate instanceOf P0 FINISHED
Object natural gas-fired power station C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: natural gas-fired power station
Context triple: [Grain Power Station, instanceOf, natural gas-fired power station]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. natural gas storage facility
    A natural gas storage facility is an engineered site where natural gas is injected, stored (often in underground formations or large tanks), and withdrawn to balance supply and demand, ensure reliability, and support market operations.
  • D. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • E. natural gas utility
    A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:05 a.m.