Triple
T28379294
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Canvey Island terminals |
E718846
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | port facility complex |
C53972
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: port facility complex Context triple: [Canvey Island terminals, instanceOf, port facility complex]
-
A.
former port facility
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
B.
docking facility
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
-
C.
port facility personnel
Port facility personnel are individuals responsible for the operation, security, safety, and management of activities and infrastructure within a port facility.
-
D.
former port community
A former port community is a settlement whose historical identity, economy, and social life were once centered on maritime trade and harbor activities that have since diminished or ceased.
-
E.
port authority
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:05 a.m.