Triple

T28379294
Position Surface form Disambiguated ID Type / Status
Subject Canvey Island terminals E718846 entity
Predicate instanceOf P0 FINISHED
Object port facility complex C53972 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port facility complex
Context triple: [Canvey Island terminals, instanceOf, port facility complex]
  • A. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • B. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • C. port facility personnel
    Port facility personnel are individuals responsible for the operation, security, safety, and management of activities and infrastructure within a port facility.
  • D. former port community
    A former port community is a settlement whose historical identity, economy, and social life were once centered on maritime trade and harbor activities that have since diminished or ceased.
  • E. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:05 a.m.