Triple

T28375587
Position Surface form Disambiguated ID Type / Status
Subject Ornament Valley rockwork E718747 entity
Predicate instanceOf P0 FINISHED
Object artificial mountain range C14288 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: artificial mountain range
Context triple: [Ornament Valley rockwork, instanceOf, artificial mountain range]
  • A. artificial hill chosen
    An artificial hill is a man-made elevation of land, constructed by humans using soil, rock, or other materials to create a raised landscape feature for practical, aesthetic, or symbolic purposes.
  • B. natural hill
    A natural hill is an elevated landform rising above the surrounding terrain with a distinct summit, formed by geological processes such as erosion, deposition, or tectonic activity.
  • C. mountain complex
    A mountain complex is an interconnected system of multiple mountain ranges, peaks, valleys, and related geological features that function together as a larger mountainous region.
  • D. mountain
    A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
  • E. Martian hill
    A Martian hill is a naturally elevated landform on the surface of Mars, typically smaller than a mountain, shaped by volcanic, impact, and erosional processes unique to the Martian environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ee5afc8190bd7375a29f0cc6c6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:03 a.m.