Triple
T28341692
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lotus Evija |
E717831
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric hypercar |
C53910
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric hypercar Context triple: [Lotus Evija, instanceOf, electric hypercar]
-
A.
electric luxury coupé
An electric luxury coupé is a high-end, two-door vehicle that combines zero-emission electric power with premium materials, advanced technology, and refined performance for an exclusive driving experience.
-
B.
electric luxury sedan
An electric luxury sedan is a high-end, four-door passenger car powered solely by electric motors and batteries, offering premium comfort, advanced technology, and refined performance.
-
C.
high-performance electric crossover
A high-performance electric crossover is a sporty, battery-powered vehicle that blends SUV practicality with car-like handling and rapid acceleration.
-
D.
battery electric city car
A battery electric city car is a compact, fully electric vehicle designed primarily for short urban trips, featuring a small footprint, limited range, and zero tailpipe emissions.
-
E.
electrified vehicle
An electrified vehicle is a mode of transportation that uses electricity, either fully or in combination with conventional fuels, to power its propulsion system.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6eb30388190b898b96c4be6f49d |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 12:40 a.m.