Triple
T2833485
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hyatt Powerplant |
E62294
|
entity |
| Predicate | gridConnection |
P845
|
FINISHED |
| Object | California electrical grid |
E298167
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: California electrical grid | Statement: [Hyatt Powerplant, gridConnection, California electrical grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: California electrical grid Context triple: [Hyatt Powerplant, gridConnection, California electrical grid]
-
A.
California electrical grid
chosen
The California electrical grid is the interconnected network of power plants, transmission lines, and distribution systems that delivers electricity across the state of California.
-
B.
California Public Utilities Commission
The California Public Utilities Commission is a state regulatory agency that oversees and sets policies for privately owned utilities in California, including electricity, natural gas, telecommunications, water, and transportation companies.
-
C.
California Energy Commission
The California Energy Commission is the state’s primary energy policy and planning agency, responsible for forecasting energy needs, promoting efficiency and renewable energy, and supporting the transition to a clean, reliable energy system.
-
D.
Western Area Power Administration
Western Area Power Administration is a U.S. federal agency that markets and transmits wholesale hydroelectric power across the western and central United States.
-
E.
PJM Interconnection
PJM Interconnection is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity across parts of the eastern United States, operating one of the world’s largest competitive power markets.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c3c39188190955b9c49d98463d8 |
completed | March 6, 2026, 9:50 p.m. |
| NER | Named-entity recognition | batch_69abdec036dc8190bc2d974f6d82eda9 |
completed | March 7, 2026, 8:16 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69afe8bf82808190a556e22d518f46f7 |
completed | March 10, 2026, 9:47 a.m. |
Created at: March 6, 2026, 10:01 p.m.