Triple
T2833468
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hyatt Powerplant |
E62294
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | energy infrastructure |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: energy infrastructure Context triple: [Hyatt Powerplant, instanceOf, energy infrastructure]
-
A.
energy ministry
The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
-
B.
energy agency
An energy agency is an organization responsible for planning, regulating, and promoting the efficient, reliable, and sustainable production, distribution, and use of energy resources within a specific region or sector.
-
C.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
D.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
E.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c3c39188190955b9c49d98463d8 |
completed | March 6, 2026, 9:50 p.m. |
Created at: March 6, 2026, 10:01 p.m.