Triple

T28309906
Position Surface form Disambiguated ID Type / Status
Subject LEM (Law Enforcement Modification) E713966 entity
Predicate instanceOf P0 FINISHED
Object Heckler & Koch technology C6155 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Heckler & Koch technology
Context triple: [LEM (Law Enforcement Modification), instanceOf, Heckler & Koch technology]
  • A. Karl-Gerät
    Karl-Gerät was a series of German World War II self-propelled siege mortars, among the largest artillery pieces ever built, designed to fire massive shells against heavily fortified targets.
  • B. German military equipment
    German military equipment encompasses the weapons, vehicles, gear, and support systems designed, produced, or used by German armed forces across different historical periods.
  • C. arms manufacturer chosen
    An arms manufacturer is a company or entity that designs, produces, and supplies weapons, ammunition, and related military equipment for use by armed forces, security agencies, or private clients.
  • D. military technology
    Military technology encompasses the specialized tools, systems, and innovations developed and used by armed forces to enhance their capabilities in defense, offense, intelligence, and logistics.
  • E. weapons engineer
    A weapons engineer is a specialist who designs, develops, tests, and improves weapon systems and related defense technologies while balancing performance, safety, and regulatory constraints.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efb5256afc8190b9322d25c3ae6320 completed April 27, 2026, 7:12 p.m.
Created at: April 27, 2026, 11:39 p.m.