Triple

T2830111
Position Surface form Disambiguated ID Type / Status
Subject Nuevo Laredo E62214 entity
Predicate hasInternationalBridge P31305 FINISHED
Object Juárez–Lincoln International Bridge
The Juárez–Lincoln International Bridge is a major vehicular border crossing over the Rio Grande that connects Nuevo Laredo, Mexico, with Laredo, Texas, facilitating significant commercial and passenger traffic between the two countries.
E309000 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Juárez–Lincoln International Bridge | Statement: [Nuevo Laredo, hasInternationalBridge, Juárez–Lincoln International Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Juárez–Lincoln International Bridge
Context triple: [Nuevo Laredo, hasInternationalBridge, Juárez–Lincoln International Bridge]
  • A. Ysleta–Zaragoza International Bridge
    The Ysleta–Zaragoza International Bridge is a major border crossing over the Rio Grande that connects El Paso, Texas, with Ciudad Juárez, Chihuahua, facilitating significant commercial and passenger traffic between the United States and Mexico.
  • B. Paso del Norte International Bridge
    The Paso del Norte International Bridge is a major border crossing that connects downtown El Paso, Texas, with Ciudad Juárez, Chihuahua, facilitating significant pedestrian and vehicular traffic between the United States and Mexico.
  • C. Hidalgo–Reynosa International Bridge
    The Hidalgo–Reynosa International Bridge is a major vehicular and pedestrian border crossing over the Rio Grande that connects the city of Hidalgo, Texas, with Reynosa, Tamaulipas, facilitating trade and travel between the United States and Mexico.
  • D. Gateway to the Americas International Bridge
    The Gateway to the Americas International Bridge is a major vehicular and pedestrian bridge over the Rio Grande that connects Laredo, Texas, in the United States with Nuevo Laredo, Tamaulipas, in Mexico, serving as a key port of entry between the two countries.
  • E. Pharr–Reynosa International Bridge
    The Pharr–Reynosa International Bridge is a major commercial and passenger border crossing over the Rio Grande that connects Pharr, Texas, in the United States with Reynosa, Tamaulipas, in Mexico.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Juárez–Lincoln International Bridge
Triple: [Nuevo Laredo, hasInternationalBridge, Juárez–Lincoln International Bridge]
Generated description
The Juárez–Lincoln International Bridge is a major vehicular border crossing over the Rio Grande that connects Nuevo Laredo, Mexico, with Laredo, Texas, facilitating significant commercial and passenger traffic between the two countries.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Juárez–Lincoln International Bridge
Target entity description: The Juárez–Lincoln International Bridge is a major vehicular border crossing over the Rio Grande that connects Nuevo Laredo, Mexico, with Laredo, Texas, facilitating significant commercial and passenger traffic between the two countries.
  • A. Ysleta–Zaragoza International Bridge
    The Ysleta–Zaragoza International Bridge is a major border crossing over the Rio Grande that connects El Paso, Texas, with Ciudad Juárez, Chihuahua, facilitating significant commercial and passenger traffic between the United States and Mexico.
  • B. Paso del Norte International Bridge
    The Paso del Norte International Bridge is a major border crossing that connects downtown El Paso, Texas, with Ciudad Juárez, Chihuahua, facilitating significant pedestrian and vehicular traffic between the United States and Mexico.
  • C. Hidalgo–Reynosa International Bridge
    The Hidalgo–Reynosa International Bridge is a major vehicular and pedestrian border crossing over the Rio Grande that connects the city of Hidalgo, Texas, with Reynosa, Tamaulipas, facilitating trade and travel between the United States and Mexico.
  • D. Gateway to the Americas International Bridge
    The Gateway to the Americas International Bridge is a major vehicular and pedestrian bridge over the Rio Grande that connects Laredo, Texas, in the United States with Nuevo Laredo, Tamaulipas, in Mexico, serving as a key port of entry between the two countries.
  • E. Pharr–Reynosa International Bridge
    The Pharr–Reynosa International Bridge is a major commercial and passenger border crossing over the Rio Grande that connects Pharr, Texas, in the United States with Reynosa, Tamaulipas, in Mexico.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3c39188190955b9c49d98463d8 completed March 6, 2026, 9:50 p.m.
NER Named-entity recognition batch_69abe08ae5048190a0a3b573d9a5fdbc completed March 7, 2026, 8:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69b055d3dbb8819094df5e6751dd96c4 completed March 10, 2026, 5:33 p.m.
NEDg Description generation batch_69b05dc976848190933a988263ef1e40 completed March 10, 2026, 6:07 p.m.
NED2 Entity disambiguation (via description) batch_69b061a2b8b48190ba01866a11a0b0c5 completed March 10, 2026, 6:23 p.m.
Created at: March 6, 2026, 10:01 p.m.