Triple

T28290759
Position Surface form Disambiguated ID Type / Status
Subject Shanghai No. 1 Metro Operation Co. Ltd. E713420 entity
Predicate instanceOf P0 FINISHED
Object urban rail operator C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban rail operator
Context triple: [Shanghai No. 1 Metro Operation Co. Ltd., instanceOf, urban rail operator]
  • A. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • B. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • C. suburban railway group
    A suburban railway group is an organization or network that coordinates and operates rail services connecting a central city with its surrounding suburban areas, typically focusing on commuter transportation.
  • D. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • E. rail transport district
    A rail transport district is a designated geographic area organized and managed to provide, coordinate, and regulate rail-based transportation services and infrastructure within its boundaries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efb52371d88190a1381c4e58a3b731 completed April 27, 2026, 7:12 p.m.
Created at: April 27, 2026, 11:29 p.m.