Triple

T2829068
Position Surface form Disambiguated ID Type / Status
Subject Reva E62191 entity
Predicate hasMajorDam P8736 FINISHED
Object Bargi Dam E56904 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bargi Dam | Statement: [Reva, hasMajorDam, Bargi Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bargi Dam
Context triple: [Reva, hasMajorDam, Bargi Dam]
  • A. Bargi Dam chosen
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Itá Dam
    Itá Dam is a large hydroelectric power plant and reservoir on the Uruguay River in southern Brazil, known for its significant contribution to regional electricity generation.
  • D. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • E. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3c39188190955b9c49d98463d8 completed March 6, 2026, 9:50 p.m.
NER Named-entity recognition batch_69abde97168c8190b31122b2ad9fdebf completed March 7, 2026, 8:15 a.m.
NED1 Entity disambiguation (via context triple) batch_69afceb4f3ec8190987afb7a2ac302e2 completed March 10, 2026, 7:56 a.m.
Created at: March 6, 2026, 10:01 p.m.