Triple
T28263843
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Google Labs |
E712650
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental platform |
C54603
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental platform Context triple: [Google Labs, instanceOf, experimental platform]
-
A.
experimental program
An experimental program is a structured, time-bound initiative designed to test new ideas, methods, or interventions under controlled conditions to evaluate their feasibility, effectiveness, and potential for broader implementation.
-
B.
experimental apparatus
An experimental apparatus is a physical setup or device designed and assembled to conduct controlled scientific investigations, measurements, or tests.
-
C.
experimental journal
An experimental journal is a structured record where researchers systematically document the design, procedures, observations, data, and interpretations of experiments over time.
-
D.
experimental area
An experimental area is a designated space equipped and organized for conducting controlled tests, trials, or research activities under specified conditions.
-
E.
experimental procedure
An experimental procedure is a structured, step-by-step set of methods and conditions designed to systematically test a hypothesis or investigate a research question.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efb5216c6881908020dce4aea65381 |
completed | April 27, 2026, 7:12 p.m. |
Created at: April 27, 2026, 11:13 p.m.