Triple
T2821337
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Palau Güell |
E54816
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | modernisme building |
C11086
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: modernisme building Context triple: [Palau Güell, instanceOf, modernisme building]
-
A.
modernist city
A modernist city is an urban environment characterized by functionalist architecture, rational planning, and an emphasis on efficiency, technology, and the separation of spaces for living, working, and recreation.
-
B.
modernist architecture work
A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
-
C.
modernist architectural work
A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
-
D.
modernist architecture movement
The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
-
E.
postmodern architecture
Postmodern architecture is a design movement that emerged in the late 20th century, characterized by eclectic forms, playful references to historical styles, and a rejection of the strict functionalism and minimalism of modernism.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e100c0819082a40cb797383243 |
completed | March 6, 2026, 9:40 p.m. |
Created at: March 6, 2026, 9:59 p.m.