Triple
T28210994
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TuMP classification |
E711168
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | British hill classification |
C6596
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: British hill classification Context triple: [TuMP classification, instanceOf, British hill classification]
-
A.
mountain classification
chosen
Mountain classification is the conceptual process of categorizing mountains based on attributes such as elevation, prominence, geology, morphology, and regional context.
-
B.
Grand National
Grand National is a prestigious annual steeplechase horse race, renowned for its challenging course and large field of runners, held at Aintree Racecourse near Liverpool, England.
-
C.
Hill
A hill is a naturally raised area of land, smaller and less steep than a mountain, with a rounded or gently sloping topography.
-
D.
hiking difficulty rating system
A hiking difficulty rating system is a standardized framework that categorizes trails based on factors like terrain, elevation gain, distance, and technical challenges to help hikers choose routes appropriate to their skill and fitness levels.
-
E.
Grand National fence
A Grand National fence is a distinctive, often formidable steeplechase obstacle at Aintree Racecourse, designed with varying heights, widths, and materials to test the jumping ability and bravery of racehorses and jockeys.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efb51cb5288190818c1f63a266af11 |
completed | April 27, 2026, 7:12 p.m. |
Created at: April 27, 2026, 10:39 p.m.