Triple
T2820503
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beijing–Guangzhou High-Speed Railway |
E54794
|
entity |
| Predicate | connectsWith |
P37
|
FINISHED |
| Object |
Shijiazhuang–Taiyuan High-Speed Railway
The Shijiazhuang–Taiyuan High-Speed Railway is a major Chinese high-speed rail line linking Hebei’s capital Shijiazhuang with Shanxi’s capital Taiyuan, significantly shortening travel times across the Taihang Mountains and integrating Shanxi into the national high-speed rail network.
|
E308013
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shijiazhuang–Taiyuan High-Speed Railway | Statement: [Beijing–Guangzhou High-Speed Railway, connectsWith, Shijiazhuang–Taiyuan High-Speed Railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Shijiazhuang–Taiyuan High-Speed Railway Context triple: [Beijing–Guangzhou High-Speed Railway, connectsWith, Shijiazhuang–Taiyuan High-Speed Railway]
-
A.
Zhengzhou–Xi’an High-Speed Railway
The Zhengzhou–Xi’an High-Speed Railway is a major high-speed rail corridor in central China linking the cities of Zhengzhou and Xi’an as part of the country’s broader high-speed rail network.
-
B.
Beijing–Guangzhou High-Speed Railway
The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
-
C.
Beijing–Shanghai High-Speed Railway
The Beijing–Shanghai High-Speed Railway is a major high-speed rail corridor in China that connects the capital Beijing with the economic hub Shanghai, significantly reducing travel time between the two megacities.
-
D.
Shanghai–Wuhan–Chengdu High-Speed Railway
The Shanghai–Wuhan–Chengdu High-Speed Railway is a major east–west high-speed rail corridor in China that links the coastal metropolis of Shanghai with central and western hubs including Wuhan and Chengdu.
-
E.
Beijing–Shanghai railway
The Beijing–Shanghai railway is one of China’s most important conventional rail lines, connecting the capital Beijing with the major economic hub of Shanghai and serving numerous key cities along its route.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Shijiazhuang–Taiyuan High-Speed Railway Triple: [Beijing–Guangzhou High-Speed Railway, connectsWith, Shijiazhuang–Taiyuan High-Speed Railway]
Generated description
The Shijiazhuang–Taiyuan High-Speed Railway is a major Chinese high-speed rail line linking Hebei’s capital Shijiazhuang with Shanxi’s capital Taiyuan, significantly shortening travel times across the Taihang Mountains and integrating Shanxi into the national high-speed rail network.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Shijiazhuang–Taiyuan High-Speed Railway Target entity description: The Shijiazhuang–Taiyuan High-Speed Railway is a major Chinese high-speed rail line linking Hebei’s capital Shijiazhuang with Shanxi’s capital Taiyuan, significantly shortening travel times across the Taihang Mountains and integrating Shanxi into the national high-speed rail network.
-
A.
Zhengzhou–Xi’an High-Speed Railway
The Zhengzhou–Xi’an High-Speed Railway is a major high-speed rail corridor in central China linking the cities of Zhengzhou and Xi’an as part of the country’s broader high-speed rail network.
-
B.
Beijing–Guangzhou High-Speed Railway
The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
-
C.
Beijing–Shanghai High-Speed Railway
The Beijing–Shanghai High-Speed Railway is a major high-speed rail corridor in China that connects the capital Beijing with the economic hub Shanghai, significantly reducing travel time between the two megacities.
-
D.
Shanghai–Wuhan–Chengdu High-Speed Railway
The Shanghai–Wuhan–Chengdu High-Speed Railway is a major east–west high-speed rail corridor in China that links the coastal metropolis of Shanghai with central and western hubs including Wuhan and Chengdu.
-
E.
Beijing–Shanghai railway
The Beijing–Shanghai railway is one of China’s most important conventional rail lines, connecting the capital Beijing with the major economic hub of Shanghai and serving numerous key cities along its route.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e100c0819082a40cb797383243 |
completed | March 6, 2026, 9:40 p.m. |
| NER | Named-entity recognition | batch_69abde6e85008190a08eb2bf8e393e7e |
completed | March 7, 2026, 8:14 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b0312dd4848190b30f6fcc11c2c954 |
completed | March 10, 2026, 2:56 p.m. |
| NEDg | Description generation | batch_69b0330cb3a08190a36aa49f6733a539 |
completed | March 10, 2026, 3:04 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b0384a8aec8190beb70b8dd2612e48 |
completed | March 10, 2026, 3:27 p.m. |
Created at: March 6, 2026, 9:59 p.m.