Triple

T28186632
Position Surface form Disambiguated ID Type / Status
Subject Forest Products Terminal E716196 entity
Predicate instanceOf P0 FINISHED
Object specialized port facility C28493 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: specialized port facility
Context triple: [Forest Products Terminal, instanceOf, specialized port facility]
  • A. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • B. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • C. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • D. maritime cargo terminal chosen
    A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
  • E. special-purpose vessel
    A special-purpose vessel is a ship specifically designed and equipped to perform dedicated tasks or services that cannot be efficiently carried out by standard commercial or passenger vessels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6b4fc5c81909dd88f01a8c2b35d completed April 27, 2026, 9:35 p.m.
Created at: April 27, 2026, 10:23 p.m.