Triple
T28186632
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Forest Products Terminal |
E716196
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | specialized port facility |
C28493
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: specialized port facility Context triple: [Forest Products Terminal, instanceOf, specialized port facility]
-
A.
former port facility
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
B.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
-
C.
docking facility
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
-
D.
maritime cargo terminal
chosen
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
-
E.
special-purpose vessel
A special-purpose vessel is a ship specifically designed and equipped to perform dedicated tasks or services that cannot be efficiently carried out by standard commercial or passenger vessels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b4fc5c81909dd88f01a8c2b35d |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 27, 2026, 10:23 p.m.