Triple

T28174293
Position Surface form Disambiguated ID Type / Status
Subject 2016 United Kingdom European Union membership referendum E715546 entity
Predicate triggeredProcess P55105 FINISHED
Object Brexit NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brexit | Statement: [2016 United Kingdom European Union membership referendum, triggeredProcess, Brexit]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: triggeredProcess
Context triple: [2016 United Kingdom European Union membership referendum, triggeredProcess, Brexit]
  • A. triggered
    Indicates that one entity causes an event, action, or process involving another entity to start or occur.
  • B. triggeredResponse
    Indicates that one entity’s action or event causes another entity to produce a specific reaction or output.
  • C. triggeredFrom chosen
    Indicates that one event, action, or process was initiated or caused as a result of another specific event, action, or process.
  • D. dynamicProcess
    Indicates an ongoing, evolving sequence of changes or interactions that unfold over time rather than a fixed or static state.
  • E. createdProcess
    Indicates that an entity is responsible for originating or bringing into existence a particular process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6b340f0819095680e15dcdc1830 completed April 27, 2026, 9:35 p.m.
NER Named-entity recognition batch_69f6423929c8819099c32e0a42b0cd4e completed May 2, 2026, 6:28 p.m.
PD Predicate disambiguation batch_69f63c6c1a948190b68c0f92c264cc0c completed May 2, 2026, 6:03 p.m.
Created at: April 27, 2026, 10:15 p.m.