Triple

T2814155
Position Surface form Disambiguated ID Type / Status
Subject AAMI Park E54242 entity
Predicate structuralEngineer P616 FINISHED
Object Arup E27685 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arup | Statement: [AAMI Park, structuralEngineer, Arup]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arup
Context triple: [AAMI Park, structuralEngineer, Arup]
  • A. Arup Associates
    Arup Associates is a multidisciplinary architectural and engineering firm known for designing innovative, high-performance buildings and cultural venues.
  • B. Buro Happold
    Buro Happold is a global engineering consultancy known for its innovative structural and environmental design on major architectural and cultural projects worldwide.
  • C. Ove Arup & Partners chosen
    Ove Arup & Partners is a globally renowned engineering and design consultancy known for its pioneering structural work on landmark projects such as the Sydney Opera House.
  • D. Mott MacDonald
    Mott MacDonald is a global engineering, management, and development consultancy known for its work on major infrastructure projects worldwide.
  • E. WS Atkins
    WS Atkins is a British multinational engineering and design consultancy renowned for its work on major infrastructure and landmark architectural projects worldwide.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49de0af08190b3da69683be1e728 completed March 6, 2026, 9:40 p.m.
NER Named-entity recognition batch_69abde4ba34c819085a336498fc326b0 completed March 7, 2026, 8:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69afce9f964081909e422aaf1f026dbb completed March 10, 2026, 7:56 a.m.
Created at: March 6, 2026, 9:59 p.m.