Triple

T28138789
Position Surface form Disambiguated ID Type / Status
Subject East Midlands Electricity Board E714284 entity
Predicate instanceOf P0 FINISHED
Object electricity board C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity board
Context triple: [East Midlands Electricity Board, instanceOf, electricity board]
  • A. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. Electricity regulatory commission
    An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
  • C. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • D. utility management company
    A utility management company is an organization that oversees, optimizes, and administers essential services such as electricity, water, gas, and waste for residential, commercial, or industrial clients.
  • E. energy supplier
    An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6af156c81908f50c2cd7db0e1ef completed April 27, 2026, 9:35 p.m.
Created at: April 27, 2026, 9:51 p.m.