Triple

T28138783
Position Surface form Disambiguated ID Type / Status
Subject British Electricity Authority E714283 entity
Predicate operatedGrid P3695 FINISHED
Object national electricity transmission system of Great Britain NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: national electricity transmission system of Great Britain | Statement: [British Electricity Authority, operatedGrid, national electricity transmission system of Great Britain]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatedGrid
Context triple: [British Electricity Authority, operatedGrid, national electricity transmission system of Great Britain]
  • A. operatedAs
    Indicates that an entity functioned or was used in the capacity, role, or identity of another entity for some period of time.
  • B. operatedAmong
    Indicates that an entity carried out operations or activities within, or in coordination with, a specified group, set, or collection of other entities.
  • C. operatesOver chosen
    Indicates that one entity performs actions or exerts functional control across, upon, or throughout another entity or domain.
  • D. operatedTo
    Indicates that one entity has performed a surgical or medical operation on another entity.
  • E. operatedHub
    Indicates that one entity functions as and manages the operations of a central hub or facility for another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6af156c81908f50c2cd7db0e1ef completed April 27, 2026, 9:35 p.m.
NER Named-entity recognition batch_69fe78e545888190a239af1a84280fa0 completed May 8, 2026, 11:59 p.m.
PD Predicate disambiguation batch_69fe7842742081908043eb950ed69f92 completed May 8, 2026, 11:56 p.m.
Created at: April 27, 2026, 9:51 p.m.