Triple

T28121922
Position Surface form Disambiguated ID Type / Status
Subject Chongqing–Guiyang Railway E710815 entity
Predicate instanceOf P0 FINISHED
Object passenger-dedicated railway C51991 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: passenger-dedicated railway
Context triple: [Chongqing–Guiyang Railway, instanceOf, passenger-dedicated railway]
  • A. passenger rail service
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • B. high-speed railway chosen
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • C. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • D. named passenger train
    A named passenger train is a specific, regularly scheduled train service distinguished by a unique name and consistent route, amenities, and branding for carrying passengers.
  • E. passenger train
    A passenger train is a rail vehicle or series of connected vehicles designed to transport people and their luggage between stations along a fixed route and schedule.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef9b73bd288190a21ae3d6aa14f386 completed April 27, 2026, 5:22 p.m.
Created at: April 27, 2026, 9:17 p.m.