Triple

T2811459
Position Surface form Disambiguated ID Type / Status
Subject General Advisory Committee of the U.S. Atomic Energy Commission E54179 entity
Predicate location P40 FINISHED
Object Washington, D.C. E23 NE FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49dcee188190b5c6eca9ae9e3469 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:59 p.m.