Triple
T28107446
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hanoi Street Circuit layout (Vietnam Grand Prix) |
E710400
|
entity |
| Predicate | eventStatus2020 |
P110998
|
FINISHED |
| Object | cancelled due to COVID-19 pandemic |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cancelled due to COVID-19 pandemic | Statement: [Hanoi Street Circuit layout (Vietnam Grand Prix), eventStatus2020, cancelled due to COVID-19 pandemic]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: eventStatus2020 Context triple: [Hanoi Street Circuit layout (Vietnam Grand Prix), eventStatus2020, cancelled due to COVID-19 pandemic]
-
A.
eventStatus
chosen
Indicates the current state or phase of an event within its lifecycle (e.g., planned, ongoing, completed, or canceled).
-
B.
festivalStatus
Indicates the current state or condition of a festival, such as whether it is planned, ongoing, postponed, or completed.
-
C.
postEventStatus
Indicates the status or condition assigned to an event after it has occurred or been processed.
-
D.
conferenceStatus
Indicates the current state or phase of a conference within its lifecycle (e.g., planned, active, completed, or canceled).
-
E.
participationStatus
Indicates the current state or condition of an entity’s involvement in an event, activity, or process (e.g., planned, active, completed, or cancelled participation).
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b71fdb081908b4a61cd7ff147c1 |
completed | April 27, 2026, 5:22 p.m. |
| NER | Named-entity recognition | batch_69f6562fd3488190be1acd8c526a28d2 |
completed | May 2, 2026, 7:53 p.m. |
| PD | Predicate disambiguation | batch_69f651a931748190a637e631a52bbfaa |
completed | May 2, 2026, 7:34 p.m. |
Created at: April 27, 2026, 9:09 p.m.