Triple
T28107414
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hanoi Street Circuit layout (Vietnam Grand Prix) |
E710400
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | motorsport circuit layout |
C36680
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: motorsport circuit layout Context triple: [Hanoi Street Circuit layout (Vietnam Grand Prix), instanceOf, motorsport circuit layout]
-
A.
racing circuit
A racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure where competitive motor or bicycle races are held.
-
B.
motorsport circuit designer
A motorsport circuit designer is a professional who plans and creates race track layouts and environments that balance safety, competitive racing, and spectator experience.
-
C.
motorcycle racing circuit
A motorcycle racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure designed specifically for competitive motorcycle racing.
-
D.
motorsport venue
A motorsport venue is a specialized facility designed and equipped to host competitive motor racing events, including tracks, spectator areas, and supporting infrastructure.
-
E.
motorsport route
chosen
A motorsport route is a predefined course or circuit, including its layout, surfaces, and environmental features, along which competitive motor races are conducted.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b71fdb081908b4a61cd7ff147c1 |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 9:09 p.m.