Triple
T28090054
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | FADU |
E709929
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urbanism school |
C8860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urbanism school Context triple: [FADU, instanceOf, urbanism school]
-
A.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
B.
school of planning
chosen
A school of planning is an academic institution or department dedicated to teaching, researching, and advancing the theory and practice of urban, regional, and environmental planning.
-
C.
university town
A university town is a community whose identity, economy, and daily life are significantly shaped by the presence and activities of one or more higher education institutions.
-
D.
public school
A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
-
E.
urban system
An urban system is an interconnected network of cities and their surrounding regions, encompassing the flows of people, goods, information, and resources that shape their social, economic, and environmental dynamics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b70fd108190a875953b2e50ca91 |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 8:57 p.m.