Triple

T28074204
Position Surface form Disambiguated ID Type / Status
Subject Port Sunlight railway station E709487 entity
Predicate lineUsesThirdRailElectrification P101606 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Port Sunlight railway station, lineUsesThirdRailElectrification, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: lineUsesThirdRailElectrification
Context triple: [Port Sunlight railway station, lineUsesThirdRailElectrification, true]
  • A. usesThirdRail chosen
    Indicates that an entity operates by drawing electric power from a third rail rather than from overhead lines or other power sources.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. thirdRailType
    Indicates the specific design or configuration type of a third rail used in an electrified railway system.
  • D. isElectricRailway
    Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
  • E. numberOfElectrifiedLines
    Indicates the quantity of railway or transit lines within a system or network that are equipped with electrical power infrastructure for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef9b6f8078819098b741274cd1a2ee completed April 27, 2026, 5:22 p.m.
NER Named-entity recognition batch_69f6403e306081909e463520c0ae7437 completed May 2, 2026, 6:19 p.m.
PD Predicate disambiguation batch_69f637120c008190b2b5adf46f022e48 completed May 2, 2026, 5:40 p.m.
Created at: April 27, 2026, 8:48 p.m.