Triple
T28058596
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Midland Railway network at Gloucester |
E709038
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway junction complex |
C11494
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway junction complex Context triple: [Midland Railway network at Gloucester, instanceOf, railway junction complex]
-
A.
railway junction
chosen
A railway junction is a point on a rail network where two or more railway lines meet or diverge, allowing trains to switch between different routes.
-
B.
railroad junction
A railroad junction is a point where two or more railway tracks meet or diverge, allowing trains to switch routes.
-
C.
railway engineering complex
A railway engineering complex is an integrated facility where railway infrastructure, rolling stock, and related systems are designed, constructed, tested, maintained, and managed.
-
D.
joint railway
A joint railway is a rail line or network that is owned, operated, or managed collaboratively by two or more railway companies or authorities, sharing infrastructure, services, and responsibilities.
-
E.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b6eb6d88190a3fea236eb0f7bed |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 8:38 p.m.