Triple
T28020074
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IGOE |
E707660
|
entity |
| Predicate | associatedInfrastructureManager |
P168522
|
FINISHED |
| Object | DB Netz AG |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: DB Netz AG | Statement: [IGOE, associatedInfrastructureManager, DB Netz AG]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: associatedInfrastructureManager Context triple: [IGOE, associatedInfrastructureManager, DB Netz AG]
-
A.
infrastructureManager
Indicates a relationship where one entity is responsible for overseeing, maintaining, or administering the infrastructure of another entity or system.
-
B.
infrastructureManagedBy
chosen
Indicates that the responsibility for operating, maintaining, or overseeing a piece of infrastructure lies with a specified managing entity.
-
C.
relatedInfrastructure
Indicates that one piece of infrastructure is connected, associated, or functionally related to another infrastructure element.
-
D.
infrastructureAssociatedWith
Indicates a relationship where a piece of infrastructure is functionally or contextually connected to, supports, or is used by another entity.
-
E.
requiresInfrastructureManagement
Indicates that one entity depends on another to provide or perform infrastructure management in order for it to function or be fulfilled.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96baf3a881909a2b63844185dddd |
completed | April 27, 2026, 5:02 p.m. |
| NER | Named-entity recognition | batch_6a00a74c0564819081e1c4c29b9d0d15 |
completed | May 10, 2026, 3:42 p.m. |
| PD | Predicate disambiguation | batch_6a00a6a63ef48190a743c88534d9d672 |
completed | May 10, 2026, 3:39 p.m. |
Created at: April 27, 2026, 8:09 p.m.