Triple

T28019968
Position Surface form Disambiguated ID Type / Status
Subject Motorola digital protocol E707658 entity
Predicate instanceOf P0 FINISHED
Object rail transport modelling standard C9052 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rail transport modelling standard
Context triple: [Motorola digital protocol, instanceOf, rail transport modelling standard]
  • A. railway technical standard
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • B. railway locomotive standardization scheme
    A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. standardized rail interface chosen
    A standardized rail interface is a uniform physical and electrical connection system that allows different rail vehicles, components, or infrastructure elements to interoperate safely and efficiently across multiple networks or manufacturers.
  • E. railway classification system
    A railway classification system is a structured framework used to categorize railways, trains, or rail services based on characteristics such as function, capacity, speed, infrastructure, or ownership.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef96baf3a881909a2b63844185dddd completed April 27, 2026, 5:02 p.m.
Created at: April 27, 2026, 8:09 p.m.