Triple

T28016964
Position Surface form Disambiguated ID Type / Status
Subject Southwest Corridor alignment of the Orange Line E707570 entity
Predicate instanceOf P0 FINISHED
Object rapid transit alignment C50529 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rapid transit alignment
Context triple: [Southwest Corridor alignment of the Orange Line, instanceOf, rapid transit alignment]
  • A. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • B. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • C. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. metro line alignment chosen
    A metro line alignment is the planned horizontal and vertical path that a metro railway follows through an urban area, balancing engineering constraints, land use, and service coverage.
  • E. rapid transit line group
    A rapid transit line group is a collection of closely related or jointly operated rapid transit lines that share infrastructure, service patterns, or branding within a transit network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef96baf3a881909a2b63844185dddd completed April 27, 2026, 5:02 p.m.
Created at: April 27, 2026, 8:07 p.m.