Triple
T28016056
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | VVER-1000 |
E707547
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Generation II reactor |
C53672
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Generation II reactor Context triple: [VVER-1000, instanceOf, Generation II reactor]
-
A.
Generation III+ reactor
A Generation III+ reactor is an advanced nuclear power plant design that enhances Generation III features with improved safety systems, higher efficiency, and longer operational lifetimes, often incorporating passive safety and standardized modular construction.
-
B.
graphite-moderated nuclear reactor
A graphite-moderated nuclear reactor is a type of nuclear fission reactor that uses graphite as a neutron moderator to slow down fast neutrons, enabling sustained chain reactions in its fuel.
-
C.
dual-purpose reactor
A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
-
D.
plutonium production reactor
A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
-
E.
water-cooled reactor
A water-cooled reactor is a nuclear reactor that uses water as both a coolant to remove heat from the reactor core and often as a moderator to slow down neutrons, enabling a controlled fission chain reaction.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96baf3a881909a2b63844185dddd |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 8:06 p.m.