Triple
T28013217
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East–West Economic Corridor |
E707475
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transnational infrastructure project |
C48020
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transnational infrastructure project Context triple: [East–West Economic Corridor, instanceOf, transnational infrastructure project]
-
A.
international transport project
chosen
An international transport project is a coordinated initiative that plans, finances, and implements cross-border transportation infrastructure or services to improve connectivity, efficiency, and economic integration between countries.
-
B.
cross-border energy infrastructure project
A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
-
C.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
transport infrastructure agreement
A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
-
E.
cross-Channel transport infrastructure
Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96ba350c81908230d0b501b974c4 |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 8:05 p.m.