Triple

T27996684
Position Surface form Disambiguated ID Type / Status
Subject Falcon 9 first stage E707031 entity
Predicate instanceOf P0 FINISHED
Object rocket first stage C11848 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rocket first stage
Context triple: [Falcon 9 first stage, instanceOf, rocket first stage]
  • A. orbital launch vehicle first stage chosen
    The orbital launch vehicle first stage is the initial propulsion segment of a rocket that provides the primary thrust to lift the vehicle off the ground and accelerate it through the lower atmosphere before separating for subsequent stages to continue to orbit.
  • B. rocket upper stage
    A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
  • C. expendable launch vehicle stage
    An expendable launch vehicle stage is a non-reusable rocket segment that houses propulsion, propellant, and associated systems, designed to operate for a specific phase of flight and then be discarded once its fuel is depleted.
  • D. prototype rocket stage
    A prototype rocket stage is an experimental segment of a launch vehicle, typically containing structure, propulsion, and control systems, built and tested to validate design concepts and performance before full-scale production.
  • E. rocket booster
    A rocket booster is a powerful propulsion component that provides the initial thrust needed to lift a launch vehicle off the ground and accelerate it through the early stages of flight.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef96b980d88190a753b2f9a978595a completed April 27, 2026, 5:02 p.m.
Created at: April 27, 2026, 7:53 p.m.