Triple

T27993852
Position Surface form Disambiguated ID Type / Status
Subject 阿拉善盟 E706952 entity
Predicate instanceOf P0 FINISHED
Object 地级行政区 C29804 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 地级行政区
Context triple: [阿拉善盟, instanceOf, 地级行政区]
  • A. 行政区
    行政区是国家或地区为便于行政管理和公共服务而依法划分的具有一定地域范围、人口和管理机构的区域单位。
  • B. provincial-level city
    A provincial-level city is an urban administrative division that holds the same rank as a province or is directly governed at the provincial level, typically encompassing both a central city and surrounding rural or suburban areas.
  • C. province-level administrative division
    A province-level administrative division is a primary subnational territorial unit within a country, governed by its own regional authorities under the framework of the national government.
  • D. Second-level administrative division chosen
    A second-level administrative division is a territorial unit within a country that is directly below the primary (first-level) administrative regions, such as provinces or states, and typically manages local governance and public services.
  • E. municipality-level division in China
    A municipality-level division in China is a top-tier administrative unit directly under the central government, combining the powers of both a city and a province to govern a large urban center and its surrounding rural areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef96b980d88190a753b2f9a978595a completed April 27, 2026, 5:02 p.m.
Created at: April 27, 2026, 7:52 p.m.