Triple
T27992607
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Allegheny Portage Railroad |
E706921
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | component of canal system |
C16044
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: component of canal system Context triple: [Allegheny Portage Railroad, instanceOf, component of canal system]
-
A.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
B.
canal infrastructure
chosen
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
-
C.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
D.
former canal
A former canal is a disused or decommissioned artificial waterway that once facilitated transportation, irrigation, or drainage but no longer serves its original function.
-
E.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96b980d88190a753b2f9a978595a |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 7:51 p.m.