Triple
T27991570
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Whitestone Parkway |
E706892
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former limited-access parkway |
C266
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former limited-access parkway Context triple: [Whitestone Parkway, instanceOf, former limited-access parkway]
-
A.
controlled-access highway
A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
-
B.
parkway
chosen
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
C.
former road bypass
A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
-
D.
park built over freeway
A park built over a freeway is an elevated green space constructed atop a highway corridor, providing recreational areas and reconnecting neighborhoods separated by the roadway below.
-
E.
urban beltway
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96b8b8d88190bad5e4ae966bf14e |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 7:50 p.m.