Triple

T27973625
Position Surface form Disambiguated ID Type / Status
Subject Asian Monetary Unit E706427 entity
Predicate instanceOf P0 FINISHED
Object regional monetary unit C10576 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional monetary unit
Context triple: [Asian Monetary Unit, instanceOf, regional monetary unit]
  • A. regional currency project
    A regional currency project is an initiative to design, implement, and manage a complementary monetary system used within a specific geographic area to support local economic activity, resilience, and community goals.
  • B. planned regional monetary fund
    A planned regional monetary fund is a proposed financial institution designed to pool resources from member countries within a specific region to provide monetary stability, balance-of-payments support, and coordinated economic policies.
  • C. currency union
    A currency union is an agreement between two or more countries to share a common currency and monetary policy, typically managed by a joint central authority.
  • D. proposed supranational currency unit chosen
    A proposed supranational currency unit is a theoretical monetary unit designed to function as a common medium of exchange and store of value across multiple sovereign nations, operating above and alongside their national currencies.
  • E. monetary policy region
    A monetary policy region is a geographic or economic area within which a single monetary authority implements a unified set of monetary policy tools and rules, typically sharing a common currency and interest rate framework.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef96b7f330819090f315318ba6977e completed April 27, 2026, 5:02 p.m.
Created at: April 27, 2026, 7:39 p.m.