Triple
T27968800
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Karl Bacon |
E704798
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ride designer |
C23374
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ride designer Context triple: [Karl Bacon, instanceOf, ride designer]
-
A.
roller coaster engineer
A roller coaster engineer designs, analyzes, and oversees the construction and maintenance of roller coasters to ensure they deliver thrilling yet safe ride experiences.
-
B.
theme park designer
chosen
A theme park designer is a professional who conceptualizes, plans, and creates immersive, story-driven environments and attractions that balance guest experience, safety, and operational efficiency.
-
C.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
D.
bicycle designer
A bicycle designer is a professional who conceptualizes, engineers, and refines bicycle frames and components to optimize performance, ergonomics, safety, and aesthetics for specific riding purposes and user needs.
-
E.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef841061e48190b5570f9562f7434d |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 7:36 p.m.