Triple
T27968686
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Main Street Vehicles |
E704795
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Main Street, U.S.A. attraction |
C53606
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Main Street, U.S.A. attraction Context triple: [Main Street Vehicles, instanceOf, Main Street, U.S.A. attraction]
-
A.
Six Flags park
A Six Flags park is a large regional amusement park that features a variety of thrill rides, family attractions, live entertainment, and themed areas, typically branded under the Six Flags corporate identity.
-
B.
Disneyland Railroad station
A Disneyland Railroad station is a themed boarding and disembarking area where guests access the park’s steam-powered trains for transportation and scenic tours around Disneyland.
-
C.
Walt Disney World Railroad station
A Walt Disney World Railroad station is a themed train stop within the Magic Kingdom where guests board and disembark vintage-style steam trains that circle the park.
-
D.
World’s Fair attraction
A World’s Fair attraction is a large-scale, often temporary exhibit or experience designed to showcase a nation’s technological, cultural, or artistic achievements to an international audience.
-
E.
seaside amusement park
A seaside amusement park is a recreational venue located along a coast that combines rides, games, food stalls, and entertainment with access to the beach and ocean views.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef841061e48190b5570f9562f7434d |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 7:36 p.m.