Triple
T27968407
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Reincarnation of Lady Plum Blossom |
E704788
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cantonese opera film |
C23991
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cantonese opera film Context triple: [The Reincarnation of Lady Plum Blossom, instanceOf, Cantonese opera film]
-
A.
Hong Kong film
chosen
Hong Kong film is a body of cinema produced in Hong Kong, characterized by its dynamic blend of action, genre innovation, and culturally hybrid storytelling that has had significant influence on global film.
-
B.
Cantonese opera singer
A Cantonese opera singer is a performer who specializes in singing, acting, and stylized movement within the traditional Cantonese opera art form, using distinct vocal techniques, costumes, and gestures to portray classical roles and stories.
-
C.
Chinese fantasy-adventure film
A Chinese fantasy-adventure film is a cinematic work that blends elements of Chinese mythology, folklore, or xianxia/wuxia traditions with action-driven quests and visually rich, otherworldly settings.
-
D.
Peking opera artist
A Peking opera artist is a highly trained performer who combines stylized singing, speech, dance, acrobatics, and symbolic gestures to portray traditional Chinese opera roles within the codified aesthetic of Peking opera.
-
E.
Chinese classic
A Chinese classic is a revered traditional text from ancient China that embodies foundational philosophies, literature, history, or cultural values and has exerted lasting influence on Chinese civilization.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef841061e48190b5570f9562f7434d |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 7:36 p.m.