Triple

T27961316
Position Surface form Disambiguated ID Type / Status
Subject Salt Lake City–St. George route E704583 entity
Predicate instanceOf P0 FINISHED
Object intercity travel corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intercity travel corridor
Context triple: [Salt Lake City–St. George route, instanceOf, intercity travel corridor]
  • A. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • C. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • D. suburban railway corridor
    A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef841061e48190b5570f9562f7434d completed April 27, 2026, 3:43 p.m.
Created at: April 27, 2026, 7:31 p.m.