Triple
T27953950
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Woodworking |
E703502
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | manufacturing process |
C53588
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: manufacturing process Context triple: [Woodworking, instanceOf, manufacturing process]
-
A.
engineering process
An engineering process is a structured, iterative sequence of activities and decisions used to design, develop, test, and maintain systems or products to meet specified requirements efficiently and reliably.
-
B.
semiconductor manufacturing process
The semiconductor manufacturing process is a highly controlled, multi-step sequence of fabrication, patterning, doping, and layering operations used to transform raw silicon wafers into functional integrated circuits and microchips.
-
C.
metallurgical process
A metallurgical process is a series of physical and chemical operations used to extract, refine, and shape metals from their ores or recycled materials into usable forms with desired properties.
-
D.
manufacturing company
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
E.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840c8b2c8190946ae9522774ba51 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 7:26 p.m.